Space association · École des Mines de Saint-Étienne
MINES SPACE
The association has been designing experimental rockets since 2019 and launches them at C’Space, the national campaign run by CNES with Planète Sciences.
- Founded in
- 2019
- Categories
- Minif · FUSEX
- Launches
- C’Space · CNES
01 The team
Our team
Current board 2026 – 2027
2026 – 2027 season
Current projects
30 active members
- 1 FUSEX
- VESPERA
- 4 Minifs
-
- Domin’space
- ATHENA
- Minecarus
- Rocket League
Former members 18
Show
Hide
-
Antonin BonneauPresident · 2025 – 2026Fourneyron & Apogée -
Quentin LiogierTreasurer · 2025 – 2026Fourneyron & Apogée -
Matthias CalmesMember · 2025 – 2026Fourneyron & Apogée -
Jorian PateauMember · 2025 – 2026ASTRA 1
-
Gaetan RouxMember · 2025 – 2026ASTRA 1
-
Gaël KandelPresident · 2024 – 2025Marianne 6 -
Thomas JourdanTreasurer · 2024 – 2025Marianne 6 -
Quentin HussonMemberFuséebulon & Prometheus -
Erwin MartinMemberFuséebulon & Prometheus -
Malo DourdainMemberFuséebulon & Prometheus -
Evann KurzawaPresident · 2023 – 2024Epsiᒧᒪon & Epsiᒧᒪon 2 -
Aldric ParentTreasurer · 2023 – 2024Epsiᒧᒪon & Epsiᒧᒪon 2 -
Paul MiailhePresident · 2019 – 2022MARSAUT 0, MARSAUT 1 & MSE -
Paul BoymondTreasurer · 2019 – 2022MARSAUT 0, MARSAUT 1 & MSE -
Quentin BakrimMemberMARSAUT 0, MARSAUT 1 & MSE -
Arthur ChassandeMemberMARSAUT 0 & MARSAUT 1 -
Sixtine PeniguelMemberMARSAUT 0 & MARSAUT 1 -
Enzo PicasMemberWebsite development
02 Missions
Our rockets, mission after mission
From a first FUSEX in 2021 to five projects running in parallel today. Click a mission to open its sheet.
Every mission follows the C’Space cycle
- RCE 1October
- RCE 2February
- RCE 3June
- LaunchJuly · Tarbes military base
-
2026 – 2027 In progress
- FUSEXVESPERA
- MinifDomin’space
- MinifATHENA
- MinifMinecarus
- MinifRocket League
30 active members · see the current board
-
2026
-
Team of 4 members
ASTRA 1
A mini-rocket powered by a Pandora motor, for the July 2026 C’Space campaign.
The mission
ASTRA 1 is a MINIF, a mini-rocket fully designed, built and integrated by MINES SPACE students for C’Space, the national launch campaign run by CNES with Planète Sciences. It carries two electronic boards: one for sequencing, the other for the experiment.
Technical sheet
- Campaign
- C’Space 2026
- Launch
- 07-2026
- Result
- Ballistic flight
- Motor
- Pandora
- Structure
- PVC tube, 4 aluminium fins
- Experiment
- Accelerometer and on-board camera
Project team
Theo VincentPresident of the association
Eliott FavardTreasurer of the association- Jorian PateauMember
- Gaetan RouxMember
Documents
Mission report · not available yet
-
-
2025
-
Team of 3 members
Fourneyron
A mini-rocket launched at C’Space in July 2025, with a nominal flight.
The mission
Fourneyron is a Minif designed and built during the 2024-2025 academic year, from September 2024 to July 2025.
Technical sheet
- Campaign
- C’Space 2025
- Launch
- 07-2025
- Result
- Nominal flight
- Motor
- Pandora
- Structure
- PETG load-bearing truss with carbon rods, phenolic cardboard tube Ø 54/57 mm
- Experiment
- Apogee detection with a Pitot probe (differential pressure + barometer)
Project team
Antonin BonneauPresident 2025 – 2026
Quentin LiogierTreasurer 2025 – 2026
Matthias CalmesMember
Documents
-
-
2024
-
Team of 3 members
Prometheus
A 2.30 m two-stage FUSEX, designed by the Fuséebulon team to go one step further: separate its stages in flight and ignite a second motor.
The mission
After Fuséebulon, the same team took on an active two-stage FUSEX: separate the stages in flight, then ignite the second motor. On board: a ball-lock separation system inspired by Bételgeuse, a pyrotechnic line with three safety levels, airbrakes and independent recovery for each stage.
Technical sheet
- Campaign
- C’Space 2024
- Launch
- 07-2024
- Result
- Ballistic flight
- Motor
- Pandora Pro 75-3G (Booster) + Pandora Pro 24-6G (Ship)
- Structure
- Two stages, 2.30 m, Ø 104 mm, 9.2 kg without motors; load-bearing truss and aluminium skin
- Experiment
- Stage separation and second-motor ignition
Project team
Malo DourdainElectronics
Quentin HussonMachining and assembly
Erwin Martin3D modelling
Documents
-
Team of 3 members
Marianne 6
A mini-rocket launched in July 2024, which made a ballistic flight.
The mission
Marianne 6 compared the flight data measured by an inertial measurement unit and by a Pitot tube. The project ran from September 2023 to July 2024.
Technical sheet
- Campaign
- C’Space 2024
- Launch
- 07-2024
- Result
- Ballistic flight
- Motor
- Pandora
- Structure
- Load-bearing skin
- Experiment
- Inertial unit vs Pitot tube comparison
Project team
Gaël KandelPresident 2024 – 2025
Thomas JourdanTreasurer 2024 – 2025
Romain BenoitMember
Documents
-
Team of 2 members
Epsiᒧᒪon 2
Epsiᒧᒪon’s successor in the FUSEX category, started in September 2023.
The mission
Epsiᒧᒪon 2 was launched in June 2024 at the Spaceport America Cup (IREC), a competition that brings together more than 1,700 students in New Mexico. The project received a 2023 Space Grant (Bourse Espace) from the Fondation Ailes de France.
Technical sheet
- Campaign
- Spaceport America Cup 2024 (IREC)
- Launch
- 06-2024
- Result
- Not provided
- Motor
- Aerotech M1315W-PS
- Structure
- Aluminium and polycarbonate
- Experiment
- Parachute hatch analysis
Project team
Evann KurzawaPresident 2023 – 2024
Aldric ParentTreasurer 2023 – 2024
Documents
-
-
2023
-
Team of 4 members
MSE
MarSonique, known as MSE: a supersonic FUSEX.
The mission
This supersonic launcher reuses the tracking architecture developed for MARSAUT 0. The project ran from September 2022 to July 2023, with design reviews RCE 1 in October 2022, RCE 2 in February 2023 and RCE 3 in June 2023.
Technical sheet
- Campaign
- C’Space 2023
- Launch
- 20-07-2023
- Result
- Ballistic flight
- Motor
- Pro 54
- Structure
- Load-bearing truss
- Experiment
- Supersonic flight, 350 g payload capacity
Project team
Paul MiailhePresident 2019 – 2022
Paul BoymondTreasurer 2019 – 2022
Quentin BakrimMember- Louis B.Member
Documents
-
Team of 2 members
Epsiᒧᒪon
A mini-rocket instrumented to measure atmospheric temperature.
The mission
Epsiᒧᒪon recorded the atmospheric temperature throughout its flight, after exceeding 27 g of acceleration on the launch rail. The project ran from September 2022 to July 2023.
Technical sheet
- Campaign
- C’Space 2023
- Launch
- 07-2023
- Result
- Nominal flight
- Motor
- Pandora
- Structure
- Load-bearing skin
- Experiment
- Atmospheric temperature measurement
Project team
Evann KurzawaPresident 2023 – 2024
Aldric ParentTreasurer 2023 – 2024
Documents
-
Team of 3 members
Fuséebulon
A mini-rocket dedicated to measuring atmospheric CO₂.
The mission
Fuséebulon recorded the variation of the CO₂ level throughout its flight. Its team then went on with the two-stage FUSEX Prometheus. The project ran from September 2022 to July 2023.
Technical sheet
- Campaign
- C’Space 2023
- Launch
- 07-2023
- Result
- Nominal flight
- Motor
- Pandora
- Structure
- Load-bearing skin
- Experiment
- In-flight CO₂ level measurement
Project team
Quentin HussonMember
Erwin MartinMember
Malo DourdainMember
Documents
-
-
2022
-
Team of 6 members
MARSAUT 1
A launcher able to carry a 3 kg payload to 2,000 m, and an autonomous demonstrator able to land at a given position.
The mission
A larger version of MARSAUT 0, recovered under a round parachute. Its payload, a “drone” released at apogee, performs a controlled descent then brakes to land at a planned point, using an electric fan and four fins that steer the airflow (thrust vectoring).
Technical sheet
- Campaign
- C’Space 2022
- Launch
- 21-07-2022
- Result
- Flight data published
- Motor
- Pro 75
- Structure
- 180 cm, Ø 120 mm, 12 kg; load-bearing truss, aluminium skin
- Experiment
- Thrust-vectoring landing drone
Project team
Paul MiailhePresident 2019 – 2022
Paul BoymondTreasurer 2019 – 2022
Quentin BakrimMember
Arthur ChassandeMember
Sixtine PeniguelMember- Melchior B.Member
Documents
-
-
2021
-
Team of 5 members
MARSAUT 0
MINES SPACE’s first space project: a single-stage FUSEX to study a tracking architecture.
The mission
Goal: follow the flight in real time. On-board sensors measure trajectory, loads and flight events, sent by LoRa telemetry (868 MHz) to a ground station that displays them live. This tracking system was later reused on MARSAUT 1 and MSE.
Technical sheet
- Campaign
- C’Space 2021
- Launch
- 22-07-2021
- Result
- Flight data published
- Motor
- Pro 54
- Structure
- Single stage, load-bearing truss, aluminium skin
- Experiment
- 868 MHz LoRa telemetry and ground station
Project team
Paul MiailhePresident 2019 – 2022
Paul BoymondTreasurer 2019 – 2022
Quentin BakrimMember
Arthur ChassandeMember
Sixtine PeniguelMember
Documents
-
-
2019
MINES SPACE is founded · December 2019
03 Gallery
Our projects in pictures
04 Contact
Get in touch
Message sent
Thank you! Your message has been passed on to the MINES SPACE board. We will get back to you soon.



